Integration in production, tests and evaluation
Based on the use and test cases of work package 1 and the test methodology teh different prototypes will be deployed, tested and evaluated on the available test systems of the partners.
The major tasks of this work package contains the design of contrete test cases based on result of work package 1, test execution and evaluation of the results. the evalutaion cover the implementation quality (perofrmance, system load, efficiency) and the Estimation on usability and user friendliness for end users besides conceptiual aspects. Based on test on dedicated test systems with the increasing quality the test will include near production sysstems. In coordination with work package 6 external user may have the possibility to test and evalute the tools.